Requirements
- Manufactured home must be sited on a foundation
- A curtain wall enclosure must be installed
- Curtain wall enclosures prevent passage of persons, animals, or debris into space beneath the mobile home
- Tie downs must be in place
- All utilities, including electrical, must be hooked up to the manufactured home
After all of these requirements are met, the applicant must contact the Building Inspector at (706) 312-5050 for final inspection.
Issuance of Certificate of Occupancy
Once the Building Inspector has made satisfactory inspection of the manufactured home, a Certificate of Occupancy will be issued (i.e. power will be allowed to be turned on).