Final Inspection

Requirements

  • Manufactured home must be sited on a foundation
  • A curtain wall enclosure must be installed
    • Curtain wall enclosures prevent passage of persons, animals, or debris into space beneath the mobile home
  • Tie downs must be in place
  • All utilities, including electrical, must be hooked up to the manufactured home
After all of these requirements are met, the applicant must contact the Building Inspector at (706) 312-5050 for final inspection.

Issuance of Certificate of Occupancy

Once the Building Inspector has made satisfactory inspection of the manufactured home, a Certificate of Occupancy will be issued (i.e. power will be allowed to be turned on).