Where to Get Your Permit
Manufactured home permits are $75 and can be obtained from:
- Planning and Development
535 Telfair St.
Augusta, GA 30901
Monday- Friday (excluding legal holidays)
8:30 am- 5:00 pm
Permit Requirements
To make a manufactured home permit application, a plat of the property on which the manufactured home is to be located shall be presented along with the information about the manufactured home (date of purchase, cost, make, year, and size). The manufactured home permit is valid for a period of six months from the date issued.
Address Posting
The
GIS Department will assign a permanent address to the lot, parcel or tract upon which the manufactured home is to be located. In compliance with the Road Naming and Addressing Ordinance, the address numbers must be placed above, on, or at the side of the appropriate door of the manufactured home so that the address numbers are clearly visible from the road.
In cases where the manufactured home is located more than 50 feet from the road, the address numbers must be placed on the mailbox or near the driveway so as to be easily read from the road. The Building Inspector will check to see that the address numbers are placed as required during the final inspection and prior to a Certificate of Occupancy being issued (i.e. prior to power being released).