Berckmans Rd Widening

Project Number: RC07-001211
Project Name: Berckmans Road Realignment and Widening (Wheeler Road to Washington Road)
GDOT ID: 0011413
Project Description: Realign Berckmans Road at Washington Road and align it with Alexander Drive to complete a continuous north-south connection between Gordon Highway and the commercial centers along Washington Road and the proposed commercial center along Riverwatch Parkway.  Project would also include bridge replacement at Raes Creek and a center left-turn lane between Wheeler and Washington Roads.

 Phase  Total Project Cost  Total TIA Cost
 ALL  $16,700,000 $16,700,000
 Total  $16,700,000  $16,700,000

Notes
This project could potentially maximize the full utility of an existing transportation facility(s).  In some cases, bypasses will be necessary.  Example benefits could be: mitigating congestion (e.g. operational improvements) and optimizing capital asset management (e.g. resurfacing, rehabilitation).  The impacts would apply to this roadway segment, corridor, and/or intersection.