Commercial Tap Fees

Water


Meter Sizes 5/8" Through 2"


Cost includes only meter, strainer, meter box and installation of the box, meter, and strainer.

Size
Turbine
Compound
3/4" x 5/8"
$249

1" $306

1-1/2" $466

2" $613
$1,248

Meter Sizes 3” & Larger

On meter and strainer listings the cost includes only the meter and strainer and does not include any valves or pipe. The meter box shall be constructed by the owner of such size and materials as approved by the Augusta Utilities Department.


Size
Turbine
Compound
3" Meter and Strainer
$893 + Installation
$1,343
4" Meter and Strainer
$1,302 + Installation
$2,118
6" Meter and Strainer
$2,331 + Installation
$3,921
8" Meter and Strainer
$3,445 + Installation


Sewer


Customer Type
Fee
Single Family Residential $125 / Unit
Commercial $125 / Unit


Developers and commercial property owners are responsible for installing all commercial taps including but not limited to sewer, domestic water, irrigation, and fire line and hydrant taps. Augusta Utilities Department does not install commercial taps (including multi-lot residential developments). An approved site plan is required for commercial tap installations. Commercial taps must be installed by a licensed utility contractor. For more information concerning the site plan process please see the Planning & Zoning Website: Land Development Review.