Full service taps are not available to commercial sites (including multi-lot developments).
Water
Meter Sizes 5/8” Through 2” & Tap Sizes 3/4” Through 2”
Cost includes tap, service line, corporation stop, curb stop, meter box, and meter. Cost does not include road crossing or sidewalk replacement - these will be added if such work is involved.
1" Tap and 5/8" x 3/4" Meter
|
$499
|
1" Tap and 1" Meter
|
$541
|
2" Tap and 1-1/2" Meter
|
$681
|
Sewer
Cost includes tap, service line, and clean-out. Cost does not include road crossing or sidewalk replacement - these will be added if such work is involved.
6" Sewer Tap and 6" Line
|
$350 / Unit
|