Gas Inspections
The following inspections should be requested according to the given instructions:
- Rough-In Piping Inspection
- After all new piping authorized by the permit has been installed
- Before any such piping has been covered or concealed
- Before any fixtures or gas appliances have been connected
- Final Piping Inspection
- After all piping authorized by the permit has been installed
- After all portions which are to be concealed by plastering and/or otherwise have been so concealed
- Before any fixtures or gas appliances have been connected
- This inspection requires a pressure test
- Final Inspection
- Must be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes. This is done to ensure compliance with all the requirements of the Standard Gas Code and to assure that the installation and construction of the gas system is in accordance with reviewed plans.
Contact Information
For more information, please contact the License and Inspection Department between 8:30 am and 5:00 pm, Monday through Friday at:
- Ph: (706) 312-5050
- Fx: (706) 312-4277