Plan Review Information

Required Documents

The following documents must be submitted prior to the plan review:
  • Two sets of plans for residential, three sets for commercial
  • Water / Sewer tap application (Septic tank application)
  • Approved site plan by Planning & Zoning - commercial sites only
  • Permit application
  • Plot plan for residential projects showing location of structure, positive drainage, and soil erosion measures (Appendix)
  • RES check for residential sites

Turnover Time

The turnover times for plan reviews are as follows:
  • Single Family Plans - Within two days of submittal. If a contractor or homeowner wishes to set up a time for review, the turnover time will be same day
  • Commercial Plans - Within 14 work-days, depending on the size and nature of the project. A contractor or designer may request a time to meet and discuss the submitted plans
  • Room Additions - Within two days of submittal

Additional Information

For more information, please contact the License and Inspection Department between 8:30 am and 5:00 pm, Monday through Friday at: